The Talk is of concern for estimated construction cost increases.
This is the very reason why you don’t build big in the first phase of advanced research, design, & development.
This is also why you don’t put all your energy design into one system.
We have been talking about this for years and yet few have had the insight to stop and listen to what we are offering to potential working partners.
Start small and stick with what has been working. Make a profit. Then grow from that operations awareness.
If you don’t know what has been working. We can’t help you. Our 1st Choice potential working partners know & have been doing it for years.
A few words on the subject. Your FEEDSTOCKS are wrong. Much less your Temp.
If selecting this Feedstock and Temp….
It is Green Chemistry that comes from the Thermo Conversion Aspects that should be considered. It is the Separation Tech that should be Advanced if you value the true profit potential as we do.
This is old, as in 2009 but it will get you up to speed on the basics, allowing for a new Biomass Fluid Catalytic Cracking (BFCC) Catalysts
Excellent People. Worthy Goal. How you don’t get cost over runs with this type of large scale objective is beyond our, proven small scale, thinking.
This is not some quick fix green race. Rather it is the Energy Business that is attempting to go green over time.
If you forget that long term fact, you will not be around, nor will your investors make money.
Case in point. The talk is of being able to use old energy refiners. Sure the integrated in the mix would like to see this, however the green in anyone who has been in this research work for over 20 years, might say, Wait a minute. Shouldn’t the Hydroprocessing REACTOR be ADVANCED?
Shouldn’t the design of the New Plant be ADVANCED. If all you are doing is talking about a MORE COSTLY Old System the cost over runs are going to be there because the old systems will also need to be advanced.
This was shown as far back as 2004. Where were some of these new green thinkers then? Even old energy Pros know they need to change how they are building their systems. That means cost overruns every time. So much so, that no one wants to go first with any new build because they know it will be outdated before it is finished, see the latest, coming out of Cal
Bottom line is this. Even the Old Energy Systems must be advanced. What is it going to cost and how long is it going to take? Don’t let anyone blow smoke up your butt. No one knows, but you can bet it will cost more and take longer than anyone attempting to promote any new idea truly understands.
Hence the reason you don’t just focus on BTL & GTL. There is far more to consider and if you are not understanding this yet. We can’t help you.
More than Willing to offer up this. It is going to take far more than any new start up can raise with some IPO. That is nothing more tnan a VC pipedream. When we say this is Large Scale, we are addressing the scope & demand of integration. This is the very reason we have been doing this with our own dime. Expect 25 years of R&D with very little hope of Rev., while in research & design mode. Energy is only one piece of a much bigger puzzle. That puzzle must be integrated, closed looped, & designed with a permaculture understanding and awareness. Old Energy doesn’t even have a CLUE in that regard and doesn’t want one either. Anyone attempting to bring green solutions to old energy design models is barking up the wrong tree and will face overruns strong enough to kill a HORSE.
The old energy integrated can afford that. Can you?